Place of Origin:
CN
Brand Name:
NONE
Certification:
NONE
Model Number:
600-815-7650
Overview
Quick Details | |
condition | NEW,100% NEW |
P/N | 600-815-7650 |
Applicable industries | Machinery Repair Shops, Food & Beverage Factory, Construction works, Energy & Mining ect. |
Product name | Stop Solenoid Valve |
Payment method | T/T |
Delivery time | 2-20 days |
Place of Origin | GuangZhou, China |
Fit For | Komatsu |
Supply Ability | 1000 Piece/Pieces per Month |
MOQ | 1 pcs/SET |
Application | Wheel Loader |
Single Package Size | 40X40X40 cm |
Weight KG | 1.000 kg |
Engine Number | W380 WR09-246 WA470-3 |
Product Keywords | 600-815-7650 Fit For Wheel Loader Engine Stop Solenoid Valve Komatsu W380 WR09-246 WA470-3 |
Packaging Details
1. Neutral Blank Packing |
2. Your Own Brand Packing |
3. Meet Your Requirements |
Port: GuangZhou |
Product Description
600-815-7650 Fit For Wheel Loader Engine Stop Solenoid Valve Komatsu W380 WR09-246 WA470-3
The use of excavator skills
When the excavator is operating, it should first choose the higher part of the excavation position, and then dig the lower part of the excavation position. Compared with the direct low excavation, this can shorten a certain operation cycle.
Our Company
Our Company ZC EXCAVATOR SPARE PARTS TRADING CO.,LTD Has Five Years Of Rich Experience In This Industry. Specializing In The Production Of Excavator Accessories, Such As Flameout Solenoid Valve, Engine, Motor, etc., Engaged In The Production And Sales Of Domestic And Foreign Products For A Long Time.Welcome You To Visit Our Company To Have More Win-Win Cooperation.
FAQ
1. A: What's The MOQ ?
R: 1 pcs We Can Send If Products In Stock.
2. A: The Products Has Warranty?
R: It Depend On Which Type Products,Some Has 1 Month,Some Has 3 Month,
The Different Products With Different Warranty Period.
3. A: What Kind Of Package Do You Have ?
R: Generally, We Can Supply Neutral Package , We Can Also Design And Make Special Package With Your Own Brand Logo.
4. A: HOW COULD I PAY?
R: T/T
5. A: How About Your Delivery Time?
R: Normally It Takes 1 To 10 Day After Receiving Your Advance Payment. The Specific Delivery Time Depends On The Item,
And The Quantity Of Your Order.
6. A: Why Your Quotation Is Different With The Price Listed In Web?
R: We Have Different Price Policy To The Buyer With Different Quantity And Demand.
You Can Contact With Me Directly To Get A Cheaner Price.
Send your inquiry directly to us