Place of Origin:
CN
Brand Name:
NONE
Certification:
NONE
Model Number:
D59-105-01
Overview
Quick Details | |
condition | NEW,100% NEW |
P/N | D59-105-01 |
Applicable industries | Manufacturing Plannt;Machinery Repair Shops;Home Use;Retail ect. |
Product name | Stop Solenoid Valve |
Payment method | T/T |
Delivery time | 2-20 days |
Place of Origin | GuangZhou, China |
Voltage(VDC) | 24 V |
Engine Model | DIESEL |
Supply Ability | 1000 Piece/Pieces per Month |
MOQ | 1 pcs/SET |
Suitable For | Dongfeng Excavator Engine Parts |
Marketing Type | Ordinary Product |
KEYWORDS | D59-105-01 Stop Solenoid Valve Suitable For Dongfeng Excavator Engine Parts 24V |
Packaging Details
1. Neutral Blank Packing |
2. Your Own Brand Packing |
3. Meet Your Requirements |
Port: GuangZhou |
Product Description
D59-105-01 Stop Solenoid Valve VDC: 24V
D59-105-01 Stop Solenoid Valve Suitable For Dongfeng Excavator Engine Parts 24V
The use of excavator skills
Avoid driving through obstacles such as tree stump and rock as much as possible to prevent the track from twisting; If an obstacle must be passed, ensure that the center of the track is on the obstacle; When walking uphill, the driving wheel should be behind to increase the adhesion of the track that hits the ground.
Our Company
Our Company ZC EXCAVATOR SPARE PARTS TRADING CO.,LTD Has Five Years Of Rich Experience In This Industry. Specializing In The Production Of Excavator Accessories, Such As Flameout Solenoid Valve, Engine, Motor, etc., Engaged In The Production And Sales Of Domestic And Foreign Products For A Long Time.Welcome You To Visit Our Company To Have More Win-Win Cooperation.
FAQ
1. A: What's The MOQ ?
R: 1 pcs We Can Send If Products In Stock.
2. A: The Products Has Warranty?
R: It Depend On Which Type Products,Some Has 1 Month,Some Has 3 Month,
The Different Products With Different Warranty Period.
3. A: What Kind Of Package Do You Have ?
R: Generally, We Can Supply Neutral Package , We Can Also Design And Make Special Package With Your Own Brand Logo.
4. A: HOW COULD I PAY?
R: T/T
5. A: How About Your Delivery Time?
R: Normally It Takes 1 To 10 Day After Receiving Your Advance Payment. The Specific Delivery Time Depends On The Item,
And The Quantity Of Your Order.
6. A: Why Your Quotation Is Different With The Price Listed In Web?
R: We Have Different Price Policy To The Buyer With Different Quantity And Demand.
You Can Contact With Me Directly To Get A Cheaner Price.
Send your inquiry directly to us